| |
Business
Energy efficient renovations
|
Take advantage of a financial assistance from the Energy Efficiency Fund (EEF) to carry out renovation work aimed at improving the thermal envelope of buildings in order to increase their energy efficiency.
|
Eligible measures
- Replacing windows;
- Compartmentalizing the building and making it airtight (to eliminate air leaks)1;
- Insulating the building;
- Installing thermal and foam screens in greenhouses.
Financial assistance2
Rebate offered for each tier of natural gas saved3.
The maximum amount of financial assistance may not exceed 50% of the cost of the measures, up to a limit of:
- $40,000 for customers with a consumption volume below 150,000 cubic meters;
- $100,000 for customers with a consumption volume of 150,000 cubic meters or more.
Minimum requirements for the work
The work must exceed the standards of the Model National Energy Code of Canada for Buildings (PDF | 38 ko).
Are you eligible for this program?
Eligible are Gaz Métro customers who own or rent commercial, industrial, institutional or multi-unit buildings with four or more units, with the exception of customers subject to tariffs 4 and 5.
Steps to follow:
You have up to 2 months following completion of the work to submit the Participant's Guide or the evaluation.
 |
Inform us about your project
Before starting the work4, you need to inform us about your project by submitting the Project outline form.
|
 |
Validate your annual consumption
Consult your bill or contact us to validate your annual consumption.
| A |
If you are consuming less than 150,000 cubic meters annually:
Complete the Participant’s Guide.
|
| B |
If you are consuming 150,000 cubic meters or more annually:
- You need to provide an evaluation of the energy savings generated by the building envelope measures that are to be implemented.
- This evaluation must be conducted by a consulting firm or any other competent service provider that is qualified to estimate the energy savings using established methods.
- You must follow the instructions which can be found in the Preparation guide for the energy savings evaluation report (PDF | 141 ko)
|
| C |
Moreover, regardless of the number of cubic meters consumed annually, if you undertake work implicating a reduction in air infiltrations (airtightness and compartmentalization of the building) :
|
|
 |
Once the work is completed, send us:
- Copies of the bills for your work and the materials installed;
- Photographs of the work done;
- Any additional documentation available describing the technical details of your project (ex: quotations from a contractor or supplier, product specification sheet, technical work description, plans, etc.)
|
|
|